The framing between walk-in closet and master bathroom has been updated to create the space for the doorway.
Read more
The framing between walk-in closet and master bathroom has been updated to create the space for the doorway.
Read more
The trim has been ripped off our old bedroom closets and the doorways framed to take the new wall. This space will be accessed from Ethan’s
Read more
The wall against which the toilet will stand has now been framed, and battens added to the other walls.
Read more
The plumbing for hot and cold water is beautifully colour-coded using PEX (cross-linked polyethylene) instead of traditional copper.
Read more
This shot illustrates the impact of cutting the wall back to reveal the window. The extra light is amazing.
Read more
Here’s what the bedroom looks like on the other side of the closet wall – plaster is coming off, and the lath is clearly visible. A
Read more
Framing is starting to go up for the walls of our walk-in closet. The image above shows battens on the side wall. The one below is
Read more
The second step has been installed in the hallway leading to my office and the kitchen. Here is an earlier photo to illustrate the location of
Read more
The latest deluge has reminded us why we need a French drain!
Read more
Some of the old soil pipe, removed from the original guest bathroom.
Read more
The trenches dug into the basement floor to house the new soil pipe have been filled with sand to support it.
Read more
This rather dodgy-looking wiring was in what will be the new powder room.
Read more