A new utility room was created by building a wall to enclose the boiler. The sump pump will be located here, at the lowest point.
Read more
A new utility room was created by building a wall to enclose the boiler. The sump pump will be located here, at the lowest point.
Read more
Here is a quick shot of the toolbox MPC have in our back garden. It’s enormous!
Read more
The new 2nd floor bathroom (replacing the one we stole for the master suite) is at the other end of the house so won’t be started
Read more
Pipe with holes in it has been laid in a trench around the basement. Combined with a sump pump, it will carry away water that would
Read more
I love how this clip separates all the cables and holds them neatly in place!
Read more
Temporary light fittings have been rigged up to make it easier to work.
Read more
Blue electrical outlet boxes have started to appear!
Read more
The washing machine used to stand on a concrete pedestal about a foot high. It is gone, and a trench has been dug to route the
Read more
Piping has been brought up for toilet and sink. All the work is very neat, including in the basement.
Read more
My office is currently a storage room. Hopefully, I will be able to keep it this tidy!
Read more
You can now really start to get a sense of how the finished home will look.
Read more
A layer of sawdust captures the footprints of those who walk through it.
Read more