I-beams make for a convenient temporary resting place.
Read moreKitchen Soil Pipe Gone
The soil pipe from the old powder room is finally gone. It had had to remain in place until a new pipe could reroute the waste
Read moreNew Soil Pipe Route
A soil pipe for the 2nd and 3rd floor bathrooms is being installed along a new route to allow for removal of the existing one –
Read moreLevelling the Corner
A plywood floor has been down in the kitchen for some time, but the corner where the chimney was removed had been left unfinished. No longer!
Read moreAlways Refer to the Plans
The guys have the kitchen plan nailed up for easy reference. Always a good idea!
Read moreLook at that Grin!
There is now a floor down in Ethan’s hidey-hole, and he’s quick to sweep up, and try it out!
Read moreBattens on Kitchen Wall
Battens have been affixed to the kitchen walls, ready for sheetrock.
Read moreBalcony Access
The window has been removed and space carved out for the door which will give us access to the balcony. It’s been boarded up for the
Read moreStairs are In!
The stairs are in, and we no longer need to use the ladder to explore what’s happening in the basement. Exciting! Here is a view looking
Read moreMaking Basement Stairs
Here, the guys are cutting triangles into a straight plank to make the stringers onto which the treads and risers will be fixed.
Read moreBathroom Tiles
Yay! We have finally made (almost all) our tile selections. They grey tile is 12″ x 24″ (~ 30cm x 60cm) and will be laid in
Read moreTucked Up for the Night
Here’s how the house looked last evening.
Read more